CHAIRMAN: DR. KHALID BIN THANI AL THANI
EDITOR-IN-CHIEF: PROF. KHALID MUBARAK AL-SHAFI

Qatar

Partial closure on Al Furousiya Roundabout for three days

Published: 26 Apr 2018 - 08:27 am | Last Updated: 01 Nov 2021 - 04:01 pm
Peninsula

The Peninsula

DOHA: The Public Works Authority ‘Ashghal’ has announced that it will implement a temporary partial closure on Al Furousiya Roundabout (Equestrian R/A) for a period of three days from the evening of April 26 (today) until the evening of Sunday (April 29) in coordination with the General Directorate of Traffic.

During the closure period, traffic heading from Umm Al Jamajim Street and Al Qalaa Street to Al Furousiya Roundabout can only turn right into Al Furousiya Street, while traffic heading from Al Furousiya Street to the roundabout can continue straight on Al Furousiya Street or turn right, as shown in the attached map.

The closure aims to enable construction works to convert Al Furousiya Roundabout into a signal-controlled intersection, as part of Al Furousiya Street Development Project. The project includes converting Al Furousiya and Muaither Roundabouts into signal-controlled intersections to ease traffic congestion in the area, in addition to increasing the number of lanes of Al Furousiya Street to four lanes in each direction with a service road on both sides of the street, in order to enhance traffic flow and increase the street capacity to accommodate current and future traffic requirements.

The Public Works Authority will install road signs advising motorists of the closure. Ashghal has requested all road users to abide by the speed limit, and follow the road signs to ensure their safety.