Doha: One kilometer on East Industrial Street and Street No 2028 will closed from Saturday, January 14 for 5 months. Motorists can use a newly built road as alternative, Public Works Authority (Ashghal) said.
The one-kilometre stretch along East Industrial Street and Street 2028 south of Roundabout 52 and Qatar Racing Club will be closed starting Saturday January 14, 2017.
The diversion will last for five months.
During this period, road users travelling to and from the Barwa Al Baraha area will have to follow the alternative route along Street 300 and the newly built diversion road as shown on the attached map.
The traffic diversion is required to allow for utility works to be carried out at one of the key interchanges on Ashghal’s West Corridor Project.
The Public Works Authority requested all road users to abide by the speed limit of 50 kph for the length of the diversion, and follow newly installed traffic road signs to ensure their safety.